Projects

Brownfield Expansion Project 

Decommission Inlet Separator

Flare KNOCKOUT

nEW INLET SEPARATOR

INSTALLED FUEL GAS SEPARATOR

400 bbl tANKS

Fabricate and installED piperacks

SHOP & fIELD FABRICATION

install & tie-in all piping

Project Overview

TeKh Group partnered with our client to expand the capacity of an existing battery by installing bullets, racks, tanks, and buildings. Working within a brownfield site presented physical challenges, compounded by a strict timeline to align with a planned turnaround. To ensure seamless integration, our team executed a precise strategy to complete the installation on schedule.

Project Outcome

TeKh Group completed the project safely, on time, and within budget overcoming time and space constraints to ensure the facility was operational as planned. The project was executed in accordance with industry best practices – B31.3 & Z662.

 

12″ Pipeline -13KM

Full 13 kms of 12” installed from start to finish

Extremely Challenging Terrain

4 HDD @ 400 M each totaling ~1600M

Header & Riser Installation and tie in’s

Pressure Test and Commissioning

Completed on time and on budget

Triple zero safety record for the job

Executed with Industry Best Practices – B31.3 & Z662

Project Overview 

TeKh Group was contracted to install a 13 km, 12” gas pipeline to support power generation within Alberta’s electrical system. The project required navigating rough terrain and adhering to a tight schedule. Our team collaborated closely to develop an efficient execution plan, which included:

  • Installation of the 13 km pipeline, including all tie-ins
  • Completion of four HDD crossings totaling 1,600 m
  • Testing and commissioning

Project Outcome

The project was successfully completed on time and within budget, securing reliable power generation and distribution for Northwest Alberta. TeKh Group achieved a Triple Zero safety record while maintaining operational efficiency. A performance-based agreement was established, providing a variable bonus to both parties for delivering the project under the proposed budget.

 

Let’s Connect

VP - Business Development

Greg Johnson

Email

403-703-8210

Employment & HR

Phil Rodney

Email

403-597-6581

Operations

Phil Rodney

Email

403-597-6581

Address

Head Office: 

PO Box 37

Eckville, Alberta

 

President - Orrin Wade

Calgary Office: 

540-5th Ave. SW

403-703-8210

 

 

Estimating & Business Development

VP Business Development - Greg Johnson